Projects / Prototype Orders

Prototype Orders

moving from Lotus Notes, Product Database

Status: Active·Sync: Attention·Last synced: 2026-04-13 17:24·Last activity: 2026-03-23 12:01
Summary
Open To-dos
26
Overdue
2
Upcoming Schedule
0
Recent Messages
0
To-do Lists + To-dos

Assigned PROs

Open

• PRO2879/01 - Bandscreen Alternative Chain Llnk Bush ST-010263 · due 2020-04-28
• PRO2890/01 - Bandscreen Brush Track Seal St-010263 · due 2020-04-28
• PRO2993/01 - Escalator Screen (Bolted) (Test Tank Version) · due 2020-04-28
• PRO3018/01 - Bandscreen Heavy Duty Roller Trials · due 2020-04-28
• PRO0078 Flow Test Tank (Grit) · due 2021-05-26
• PRO0101 - LS Retractable Chute for Skip Placement · due 2021-08-23
• PRO0224 - 905-110872 (110872-04) Frame · due 2023-09-01
• PRO0345 - Foam O-ring adhesive test
+ 9 more

In Progress PROs

Open

• PRO0025 Manifold Green Ball Specification · due 2020-09-25
• PRO0036 - Air Vent Valve - Red TPX Ball · due 2020-10-28
• PRO0043 - Striker Pin s6 Tolerance · due 2020-12-02
• PRO0049 - Inco Capacitor Sleeve · due 2021-01-04
• PRO0065 - Inco 3ph loom sample - Additional Tape · due 2021-03-10
• PRO0079 - Inco Conversion · due 2021-04-23
• PRO0100 - Escalator New Invert Seal Testing · due 2021-11-09
• PRO0113 - LS Retractable Chute Mark 2 · due 2022-04-08
+ 12 more

Rejected PROs

Open

• PRO3027/03 - Impeller Hub and Cap Tightening Tool · due 2020-04-28
• PRO3023/01 - Lower Lid Moulding (901-110878) - Sample Approval Request · due 2020-04-28
• PRO3027/01 - IMPELLER SPINNING MACHINED FACE · due 2020-04-28
• ----
• PRO0201 - Panaway M1 Coiled Hose Test
• PRO0200 - Panaway M1 NA Specifciation

Completed PROs

Open

• PRO0001 Plumbing Assembly (Test) · due 2020-04-28
• PRO0004 - Fixed Bridge Latch - No Interlock · due 2020-06-12
• PRO0005 Motor O-ring lubrication · due 2020-06-12
• PRO0007 - Capacitor Sleeve Sheet Metal Parts · due 2020-06-18
• PRO0002 Escalator Live Testing · due 2020-06-26
• PRO0006 - 115293-01 Capacitor Sleeve · due 2020-06-26
• PRO0010 - Capacitor Sleeve Sheet Metal Parts II · due 2020-07-09
• PRO0009 - 115293-01 902 Capacitor Sleeve Priority: HIGH · due 2020-07-09
+ 199 more
Messages

PRO1TBC - Vortex Tests with Warm / Hot water

Unknown · 2025-05-08 13:44

Schedule Entries
No mirrored schedule entries yet.
Documents

Email Request.png

Document · Ryan Hodges

Foam_O_Ring.JPG

Document · Ryan Hodges

Capture.JPG

Document · Ryan Hodges

20260319_145318.jpg

Document · Ryan Hodges

20260319_145424.jpg

Document · Ryan Hodges

20260319_151358.jpg

Document · Ryan Hodges

Loom update to accommodate switching to LOP-200-24.docx

Document · Sam Everitt

20260129_150521~2.jpg

Document · Sam Everitt

20260202_100025.jpg

Document · Sam Everitt

20260129_150854~2.jpg

Document · Sam Everitt

20260202_095131.jpg

Document · Sam Everitt

Rear Positive Break Switch Improvement Proposal.docx

Document · Ryan Hodges

OSP-TL0453 v 1.0.pdf

Document · Ryan Hodges

Test Item Submission Form V1.0 14.10.2025.docx

Document · Ryan Hodges

Relay to Overload Cable Removed.jpeg

Document · Ryan Hodges

Overload Cable Removed.jpeg

Document · Ryan Hodges

Pump Disconnected.jpeg

Document · Ryan Hodges

Re_ Fwd_ FW_ No-Load Current Behaviour – Motor Ref. 909-014614.msg

Document · Ryan Hodges

PRO Parts Email.msg

Document · Ryan Hodges

Fw EPP-150-24 to LOP-200-24.eml

Document · Sam Everitt

LOP-200,300-TUV_EN60335-1 -certificate.pdf

Document · Ryan Hodges

Motors for Return.xlsx

Document · Ryan Hodges

Motors for Return.xlsx

Document · Ryan Hodges

Z10041 Clamp Meter.pdf

Document · Ryan Hodges

WI0002 - Carpanelli Motor Pre-Prod Checks.pdf

Document · Ryan Hodges

Recent Activity
Assigned PROs
2026-03-23 12:01 · Todolist
Email Request.png
2026-03-23 12:01 · Ryan Hodges · Document
Foam_O_Ring.JPG
2026-03-23 12:01 · Ryan Hodges · Document
PRO0345 - Foam O-ring adhesive test
2026-03-23 12:01 · Todo
PRO0345 - Foam O-ring adhesive test
Capture.JPG
2026-03-20 10:45 · Ryan Hodges · Document
20260319_145318.jpg
2026-03-20 10:45 · Ryan Hodges · Document
20260319_145424.jpg
2026-03-20 10:45 · Ryan Hodges · Document
20260319_151358.jpg
2026-03-20 10:45 · Ryan Hodges · Document
PRO0342 - 903-116381 Backplate Assy Checks
2026-03-12 08:51 · Todo
PRO0342 - 903-116381 Backplate Assy Checks
PRO0344 - x2 Panaway UV Pre-Production Build
2026-03-02 11:23 · Todo
PRO0344 - x2 Panaway UV Pre-Production Build
----
2026-03-02 09:30 · Todo
----
PRO0343 - TestLabs UV Testing Pt. 2
2026-03-02 09:30 · Todo
PRO0343 - TestLabs UV Testing Pt. 2
In Progress PROs
2026-03-02 09:30 · Todolist
Loom update to accommodate switching to LOP-200-24.docx
2026-02-09 14:47 · Sam Everitt · Document
PRO0325 - MeanWell PSU Alternative
2026-02-09 14:47 · Todo
PRO0325 - MeanWell PSU Alternative
20260129_150521~2.jpg
2026-02-06 16:32 · Sam Everitt · Document
20260202_100025.jpg
2026-02-06 16:32 · Sam Everitt · Document
20260129_150854~2.jpg
2026-02-06 16:32 · Sam Everitt · Document
20260202_095131.jpg
2026-02-06 16:32 · Sam Everitt · Document
PRO0341 - Stepping Drive Arm Machining
2026-02-05 09:52 · Todo
PRO0341 - Stepping Drive Arm Machining
Rear Positive Break Switch Improvement Proposal.docx
2026-01-28 15:35 · Ryan Hodges · Document
PRO0290 Adjustable Brake Switch Brackets
2026-01-28 15:35 · Todo
PRO0290 Adjustable Brake Switch Brackets
Completed PROs
2026-01-28 15:35 · Todolist
(to be closed only by authorised person)
----
2026-01-28 13:54 · Todo
----
PRO0335 - UV Lens Upgrade - O-ring Test
2026-01-28 13:54 · Todo
PRO0335 - UV Lens Upgrade - O-ring Test
PRO0338 - Return Motor Checks
2026-01-28 13:54 · Todo
PRO0338 - Return Motor Checks
PRO0336 - UV Operation Check - UV Intensity Card
2026-01-28 13:54 · Todo
PRO0336 - UV Operation Check - UV Intensity Card
OSP-TL0453 v 1.0.pdf
2026-01-28 13:46 · Ryan Hodges · Document
Test Item Submission Form V1.0 14.10.2025.docx
2026-01-28 13:46 · Ryan Hodges · Document
Relay to Overload Cable Removed.jpeg
2026-01-28 13:31 · Ryan Hodges · Document
Overload Cable Removed.jpeg
2026-01-28 13:31 · Ryan Hodges · Document
Pump Disconnected.jpeg
2026-01-28 13:31 · Ryan Hodges · Document
Re_ Fwd_ FW_ No-Load Current Behaviour – Motor Ref. 909-014614.msg
2026-01-28 11:52 · Ryan Hodges · Document
PRO Parts Email.msg
2026-01-28 11:45 · Ryan Hodges · Document
Fw EPP-150-24 to LOP-200-24.eml
2026-01-21 10:39 · Sam Everitt · Document
LOP-200,300-TUV_EN60335-1 -certificate.pdf
2026-01-21 08:56 · Ryan Hodges · Document
PRO0326 - Cistern Outlet Position Change
2026-01-21 07:50 · Todo
PRO0326 - Cistern Outlet Position Change
PRO0302 - UV 5-Hour daily test
2026-01-21 07:50 · Todo
PRO0302 - UV 5-Hour daily test
PRO0296 - Trolley Frame
2026-01-21 07:50 · Todo
PRO0296 - Trolley Frame
PRO0298 New Frame
2026-01-21 07:50 · Todo
PRO0298 New Frame
Card Table
No mirrored card-table items yet.
Sync History
No sync history yet.