| Project | Status | Last Synced | Last Activity | Open To-dos | Overdue | Upcoming | Messages | Sync | |
|---|---|---|---|---|---|---|---|---|---|
FujiClean CEN5 with gravity outlet & a separate Pump station | Active | 2026-04-13 15:49 | 2026-11-02 00:00 | 61 | 0 | 1 | 0 | Ok | OpenBasecamp |
Wolverton Common - INSTALLS Project - Wolverton Road, Tadley, Hampshire, RG26 5RZ - Thames Water | Active | 2026-04-13 17:48 | 2026-05-11 01:00 | 69 | 1 | 0 | 0 | Attention | OpenBasecamp |
Joanna Crane - Valley Farm House, DE12 7DQ - 07779 191979 - joanna@joannacrane.co.uk - Fuji CEN 5 | Active | 2026-04-13 16:46 | 2026-04-27 01:00 | 51 | 0 | 1 | 0 | Ok | OpenBasecamp |
Andrew Thomas - STP Install - 36 Cromford Road, Crich, Matlock DE4 5DJ - ajt28031966@gmail.com - 07706142456 | Active | 2026-04-13 15:52 | 2026-04-27 01:00 | 50 | 2 | 1 | 0 | Attention | OpenBasecamp |
INSTALL - Philip Morgan, Trinity Farm, Coldharbour Lane, Ashover DE55 6EE - thefourlimes@btopenworld.com - 07710 793603 - Fuji CRX II-7 to drain field | Active | 2026-04-24 11:17 | 2026-04-23 15:42 | 51 | 1 | 0 | 0 | Attention | OpenBasecamp |
Installation Of Pump Station To Ditch | Active | 2026-04-23 12:30 | 2026-04-23 12:28 | 51 | 0 | 0 | 0 | Ok | OpenBasecamp |
Installation of Tricel UK6 Pumped to Ditch | Active | 2026-04-23 12:25 | 2026-04-23 12:17 | 51 | 0 | 0 | 0 | Ok | OpenBasecamp |
Roddy Pattenburger - Perc Test - Long Barn, Dummer, Basingstoke RG25 2AZ - 07956 528658 - roddyp@gmail.com | Active | 2026-04-13 17:28 | 2026-04-23 01:00 | 22 | 2 | 1 | 0 | Attention | OpenBasecamp |
moving from Lotus Notes | Active | 2026-04-24 11:21 | 2026-04-22 14:53 | 201 | 17 | 0 | 2 | Attention | OpenBasecamp |
Remedials - Daniel Bell and Stephen Snyders - FujiClean CEN 5 -Five Bars, Ilmer, Princes Risborough, HP27 9QZ - 07732687226/07866737458 - daniel.bell@inmoment.com, stephensnyders@gmail.com | Active | 2026-04-24 11:20 | 2026-04-17 09:02 | 51 | 0 | 0 | 0 | Ok | OpenBasecamp |
HEC Group Tenders | Active | 2026-04-24 11:17 | 2026-04-13 09:21 | 13 | 4 | 0 | 0 | Attention | OpenBasecamp |
Haigh Estate 2024-2025 Yearly Plan | Active | 2026-04-13 16:27 | 2026-04-11 09:10 | 27 | 0 | 0 | 0 | Ok | OpenBasecamp |
(not concessions) | Active | 2026-04-13 17:06 | 2026-04-09 12:06 | 104 | 13 | 0 | 0 | Attention | OpenBasecamp |
Daniel Bell and Stephen Snyders - FujiClean CEN 5 -Five Bars, Ilmer, Princes Risborough, HP27 9QZ - 07732687226/07866737458 - daniel.bell@inmoment.com, stephensnyders@gmail.com | Active | 2026-04-13 16:05 | 2026-04-08 11:15 | 51 | 3 | 0 | 0 | Attention | OpenBasecamp |
John Phipps - White House, Heswall, CH60 9JZ - FujiClean CEN 5 With drainage field & Surface water drain alteration - jphipps@cokebusters.com - 07734 151361 | Active | 2026-04-13 16:47 | 2026-04-07 11:11 | 51 | 1 | 0 | 0 | Attention | OpenBasecamp |
Tricel Maxus Combi 7A with a pumped outlet, x1 twin effl macerator ps & x1 twin crude ps - Chris B. | Active | 2026-04-13 17:28 | 2026-04-02 10:42 | 62 | 2 | 0 | 0 | Attention | OpenBasecamp |
Perc Test - Chilwell Cemetery, Beeston, Nottingham, NG9 5NZ - Charlotte Davis - 0330 133 1475 - charlotte@dsc-grp.co.uk | Active | 2026-04-13 17:20 | 2026-04-01 10:34 | 51 | 0 | 0 | 0 | Ok | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 16:38 | 2026-03-31 12:08 | 65 | 0 | 0 | 0 | Ok | OpenBasecamp |
FujiClean - supply only deliveries with commissions | Active | 2026-04-13 17:15 | 2026-03-31 09:19 | 23 | 8 | 0 | 0 | Attention | OpenBasecamp |
Connection to the Sewer with new crude Pump station - Chris B. | Active | 2026-04-13 16:59 | 2026-03-30 13:57 | 49 | 3 | 0 | 0 | Attention | OpenBasecamp |
591 ACE Screener c/w flow control and remote LS305 | Active | 2026-04-13 16:54 | 2026-03-26 14:33 | 26 | 4 | 0 | 0 | Attention | OpenBasecamp |
491 ACE screener in pre-fab c/w flow control and panel | Active | 2026-04-13 17:22 | 2026-03-24 14:20 | 26 | 4 | 0 | 0 | Attention | OpenBasecamp |
moving from Lotus Notes, Product Database | Active | 2026-04-13 17:24 | 2026-03-23 12:01 | 26 | 2 | 0 | 0 | Attention | OpenBasecamp |
Hope Cross, Buckhorn Weston, Gillingham SP8 5SS - Ditch dredging - 13&14/03/2026 | Active | 2026-04-13 16:35 | 2026-03-18 12:10 | 51 | 0 | 0 | 0 | Ok | OpenBasecamp |
741 Screener in Prefab with Inlet Box | Active | 2026-04-13 15:57 | 2026-03-17 13:37 | 1 | 0 | 0 | 0 | Ok | OpenBasecamp |
Tricel 8 pumped outlet - Chris B. & Andy Lowe | Active | 2026-04-13 16:40 | 2026-03-17 10:50 | 61 | 9 | 0 | 0 | Attention | OpenBasecamp |
Tony Robinson - INSTALL - 3 Bournebrook Cottage, Sutton Road, Tamworth B78 3DY - 07779 174475 -tonyrobinson@mail.com | Active | 2026-04-13 17:43 | 2026-03-17 10:49 | 51 | 3 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 16:21 | 2026-03-16 09:10 | 81 | 9 | 0 | 0 | Attention | OpenBasecamp |
Peter Humphrey - INSTALL - Adjacent East View, Gote Lane, Gorefield, Wisbech, Cambridge PE13 4NJ - 07711 010341 - peterh@peterhumphrey.co.uk | Active | 2026-04-13 17:21 | 2026-03-16 08:30 | 50 | 4 | 0 | 0 | Attention | OpenBasecamp |
Philip Morgan, Trinity Farm, Coldharbour Lane, Ashover DE55 6EE - thefourlimes@btopenworld.com - 07710 793603 - PERC TEST | Active | 2026-04-13 17:22 | 2026-03-16 08:25 | 51 | 4 | 0 | 0 | Attention | OpenBasecamp |
Percolation test - Callum Thacker | Active | 2026-04-13 17:41 | 2026-03-12 13:20 | 48 | 0 | 0 | 0 | Ok | OpenBasecamp |
Rebecca Barker - Marsh Ensign 12 - Woodland Barn, Ripley DE5 3RH - 07729 707894 - docbec@doctors.org.uk | Active | 2026-04-13 17:26 | 2026-03-12 13:03 | 51 | 1 | 0 | 0 | Attention | OpenBasecamp |
Nicola O’Donnell - West Hall Farm, Burnley Road, Hapton, Burnley, BB11 5QT - Fuji CEN 5 - nicolaodonnell@smartstepsrehabilitationcm.com - 07790 200928 | Active | 2026-04-13 17:13 | 2026-03-12 10:42 | 50 | 6 | 0 | 0 | Attention | OpenBasecamp |
Roy and Rachel Allum - Marsh16 INSTALL - Sycamore Lodge, Green Lane, Melton Mowbray, LE14 3QF - 07710 193916 – roy.allum@btinternet.com | Active | 2026-04-13 17:29 | 2026-03-12 10:38 | 50 | 4 | 0 | 0 | Attention | OpenBasecamp |
Morland STW - Eric Wright - United Utilities | Active | 2026-04-13 17:06 | 2026-03-12 10:35 | 25 | 1 | 0 | 0 | Attention | OpenBasecamp |
Nick Dutton - Greenacres, Halam, Newark NG22 8AN - 07590 446336 - nick@theduttons.co.uk | Active | 2026-04-13 17:12 | 2026-03-12 10:28 | 49 | 1 | 0 | 0 | Attention | OpenBasecamp |
M J Abbott - Adrian Riggs - SP3 5EB -0781 0185367 Supply Only - Moonfleet Manor | Active | 2026-04-13 16:55 | 2026-03-10 10:36 | 22 | 7 | 0 | 0 | Attention | OpenBasecamp |
Connection to sewer via gravity feed in 3 stages - Chris B. & his associate Andy Lowe | Active | 2026-04-13 17:43 | 2026-03-09 16:15 | 106 | 1 | 0 | 0 | Attention | OpenBasecamp |
Install a 7,000ltr Cesspool & a 8,000ltr Rainwater Harvesting System (RHS) - Shaun Coupe & Callum Thacker | Active | 2026-04-13 16:46 | 2026-03-06 15:12 | 59 | 0 | 0 | 0 | Ok | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 17:10 | 2026-03-06 14:49 | 61 | 0 | 0 | 0 | Ok | OpenBasecamp |
Tricel Vento 6 Septic tank gravity - Shaun Coupe | Active | 2026-04-13 16:22 | 2026-03-06 13:08 | 59 | 0 | 0 | 0 | Ok | OpenBasecamp |
FujiClean CEN5 with gravity outlet - Chris B. | Active | 2026-04-13 15:51 | 2026-03-06 12:09 | 56 | 1 | 0 | 0 | Attention | OpenBasecamp |
OLD - Wolverton Common - Wolverton Road, Tadley, Hampshire, RG26 5RZ - Thames Water | Active | 2026-04-13 17:15 | 2026-03-06 09:11 | 26 | 1 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 17:20 | 2026-03-06 09:11 | 57 | 0 | 0 | 0 | Ok | OpenBasecamp |
FujiClean CEN5 with gravity outlet - Chris B. & Andy Lowe | Active | 2026-04-13 17:20 | 2026-03-06 09:11 | 56 | 0 | 0 | 0 | Ok | OpenBasecamp |
United Utilities - FujiClean scanning - Stantec - HR9 5NG | Active | 2026-04-13 17:45 | 2026-03-05 17:40 | 12 | 2 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 16:30 | 2026-03-05 17:00 | 60 | 18 | 0 | 0 | Attention | OpenBasecamp |
FujiClean CEN7 with pumped outlet & Single effluent pump station - Chris B. & Andy Lowe & Jamie | Active | 2026-04-13 16:09 | 2026-03-05 16:57 | 76 | 1 | 0 | 0 | Attention | OpenBasecamp |
Angela Simkins - STP Install - 7 Tern Hill, Market Drayton TF9 3PZ - angelasimkins@btinternet.com - 07801468414 | Active | 2026-04-13 15:53 | 2026-03-05 16:54 | 50 | 0 | 0 | 0 | Ok | OpenBasecamp |
FujiClean CEN5 with upgraded twin crude pump station - Chris B. & Andy Lowe | Active | 2026-04-13 15:53 | 2026-03-05 16:54 | 59 | 1 | 0 | 0 | Attention | OpenBasecamp |
FujiClean CEN14 with external twin effluent Pump station - Shaun Coupe & Callum Thacker | Active | 2026-04-13 15:49 | 2026-03-05 16:54 | 61 | 0 | 0 | 0 | Ok | OpenBasecamp |
United Utilities, Troutbeck, WWTW, Troutbeck, Ambleside, Cumbria, LA22 1PQ. W3W – anguished.pipeline.shell | Active | 2026-04-13 17:45 | 2026-03-05 16:49 | 42 | 0 | 0 | 0 | Ok | OpenBasecamp |
FujiClean CRX50 with gravity outlet - Chris B. & Andy Lowe | Active | 2026-04-13 17:48 | 2026-03-05 16:49 | 71 | 0 | 0 | 0 | Ok | OpenBasecamp |
STP Install Sales - October 2023 | Active | 2026-04-13 17:38 | 2026-03-04 20:54 | 26 | 21 | 0 | 0 | Attention | OpenBasecamp |
James Toyne - Upper Holt Farm, Barber Booth, Edale, S33 7ZL - toynejames@hotmail.com - 07890 884 117 FujiClean CEN5 with gravity outlet - Shaun Coupe & Callum Thacker | Active | 2026-04-13 16:41 | 2026-02-27 13:06 | 50 | 2 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 17:27 | 2026-02-27 13:04 | 63 | 1 | 0 | 0 | Attention | OpenBasecamp |
Tricel UK12 with pumped outlet, riser to suit invert & single crude pump station - Chris B. & Andy Lowe | Active | 2026-04-13 17:23 | 2026-02-27 13:04 | 66 | 0 | 0 | 0 | Ok | OpenBasecamp |
Ian Saunders - Marsh Shallow 3800L Septic tank to drainfield- Hatchaway, Earl Sterndale, Buxton, SK17 0EP - iasaunders@yahoo.co.uk | Active | 2026-04-13 16:38 | 2026-02-27 13:04 | 50 | 2 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 16:56 | 2026-02-27 13:04 | 62 | 1 | 0 | 0 | Attention | OpenBasecamp |
FujiClean CEN5 STP with pumpstation outlet - Shaun Coupe | Active | 2026-04-13 16:56 | 2026-02-27 13:04 | 61 | 1 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 16:56 | 2026-02-27 13:04 | 56 | 0 | 0 | 0 | Ok | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 16:55 | 2026-02-27 13:04 | 57 | 0 | 0 | 0 | Ok | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 16:45 | 2026-02-27 13:03 | 56 | 0 | 0 | 0 | Ok | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 16:45 | 2026-02-27 13:03 | 56 | 0 | 0 | 0 | Ok | OpenBasecamp |
FujiClean CEN5 STP gravity - Shaun Coupe | Active | 2026-04-13 17:42 | 2026-02-27 13:02 | 59 | 0 | 0 | 0 | Ok | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 16:39 | 2026-02-27 13:01 | 57 | 0 | 0 | 0 | Ok | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 16:39 | 2026-02-27 13:01 | 57 | 0 | 0 | 0 | Ok | OpenBasecamp |
Marsh 3,800L Septic tank with gravity outlet - Mark M. & Jamie | Active | 2026-04-13 15:53 | 2026-02-27 13:01 | 57 | 1 | 0 | 0 | Attention | OpenBasecamp |
Tricel UK6 STP with gravity outlet - Shaun Coupe & his associates | Active | 2026-04-13 17:01 | 2026-02-27 12:57 | 59 | 2 | 0 | 0 | Attention | OpenBasecamp |
STP Sales - Installs - October 2022 | Active | 2026-04-24 12:21 | 2026-02-25 13:08 | 15 | 11 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 17:45 | 2026-02-17 16:20 | 73 | 1 | 0 | 0 | Attention | OpenBasecamp |
Marsh Ensign 8 STP with pumped outlet - Chris B. & Andy Lowe | Active | 2026-04-13 17:31 | 2026-02-16 09:28 | 65 | 0 | 0 | 0 | Ok | OpenBasecamp |
St Breward Stw - Tecker - South West Water - | Active | 2026-04-13 17:35 | 2026-02-13 10:00 | 26 | 0 | 0 | 0 | Ok | OpenBasecamp |
Google Alerts and Web Analytics | Active | 2026-04-13 16:23 | — | 0 | 0 | 0 | 0 | Ok | OpenBasecamp |
Tricel Vento 12 Septic tank with gravity outlet - Chris B. | Active | 2026-04-13 16:40 | 2026-02-11 16:11 | 48 | 0 | 0 | 0 | Ok | OpenBasecamp |
(splitting this out from the Modifications part of Lotus Notes which is elsewhere) | Active | 2026-04-13 16:02 | 2026-02-11 11:32 | 16 | 3 | 0 | 0 | Attention | OpenBasecamp |
Basildon Park - Mead Lane Basildon Berkshire RG8 9NY https://what3words.com/take.goodness.lifetimes Thames Water | Active | 2026-04-13 15:54 | 2026-02-11 10:20 | 22 | 0 | 0 | 0 | Ok | OpenBasecamp |
Old Buckenham Stw - Anglian Water | Active | 2026-04-13 17:15 | 2026-02-06 10:36 | 26 | 0 | 0 | 0 | Ok | OpenBasecamp |
HMP Elmley - GSE - MOJ | Active | 2026-04-13 16:34 | 2026-02-06 10:33 | 26 | 0 | 0 | 0 | Ok | OpenBasecamp |
Great Ellingham - Anglian Water - | Active | 2026-04-13 16:25 | 2026-02-03 16:53 | 26 | 0 | 0 | 0 | Ok | OpenBasecamp |
HMP Channingswood Second Screen Stw - Keir - MOJ | Active | 2026-04-13 16:33 | 2026-02-03 16:52 | 26 | 0 | 0 | 0 | Ok | OpenBasecamp |
Nicola O’Donnell - West Hall Farm, Burnley Road, Hapton, Burnley, BB11 5QT - PERC TEST - nicolaodonnell@smartstepsrehabilitationcm.com - 07790 200928 | Active | 2026-04-13 17:13 | 2026-02-02 15:20 | 50 | 2 | 0 | 0 | Attention | OpenBasecamp |
490 ACE Screener in a Prefab | Active | 2026-04-13 17:41 | 2026-02-02 10:42 | 26 | 26 | 0 | 0 | Attention | OpenBasecamp |
Roger Ward - Rough Hayes Farm, Needwood, Burton-on-Trent DE13 9PX - 07976 208074 - rdwconstruction@icloud.com | Active | 2026-04-13 17:28 | 2026-01-30 11:24 | 50 | 1 | 0 | 0 | Attention | OpenBasecamp |
moving from Lotus Notes Product Database | Active | 2026-04-13 16:11 | 2026-01-29 09:25 | 6 | 2 | 0 | 0 | Attention | OpenBasecamp |
moving from Lotus Notes Product Database | Active | 2026-04-13 17:25 | 2026-01-29 08:42 | 25 | 12 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 16:20 | 2026-01-28 10:33 | 23 | 1 | 0 | 0 | Attention | OpenBasecamp |
490 Screener - Channel Mounted | Active | 2026-04-13 17:29 | 2026-01-23 10:38 | 0 | 0 | 0 | 0 | Ok | OpenBasecamp |
Llandovery Stw - Bridges - Welsh Water (Dwr Cymru) | Active | 2026-04-13 16:53 | 2026-01-23 10:01 | 26 | 0 | 0 | 0 | Ok | OpenBasecamp |
491 ACE Screener c/w Automated Flow Control | Active | 2026-04-13 15:54 | 2026-01-23 10:00 | 28 | 26 | 0 | 0 | Attention | OpenBasecamp |
JN Bentley Welsh Water | Active | 2026-04-13 17:40 | 2026-01-22 15:12 | 21 | 21 | 0 | 0 | Attention | OpenBasecamp |
Croyde Stw - South West Water | Active | 2026-04-13 16:04 | 2026-01-21 13:19 | 28 | 0 | 0 | 0 | Ok | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 17:27 | 2026-01-20 13:27 | 58 | 0 | 0 | 0 | Ok | OpenBasecamp |
591 ACE Screener in a Prefab | Active | 2026-04-13 15:56 | 2026-01-14 12:11 | 27 | 26 | 0 | 0 | Attention | OpenBasecamp |
Connection to main sewer - Chris B. | Active | 2026-04-13 16:57 | 2026-01-13 09:14 | 59 | 0 | 0 | 0 | Ok | OpenBasecamp |
Marsh Ensign 6 with gravity outlet - Shaun Coupe & Callum Thacker | Active | 2026-04-13 17:31 | 2026-01-06 09:36 | 64 | 3 | 0 | 0 | Attention | OpenBasecamp |
Land drain - Chris B. & Andy Lowe | Active | 2026-04-13 16:31 | 2026-01-06 09:36 | 64 | 1 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-24 10:34 | 2026-01-06 09:36 | 51 | 2 | 0 | 0 | Attention | OpenBasecamp |
Marsh Ensign 25 pumped outlet & Tricel pumped panel - Shaun Coupe & Callum Thacker & Jamie | Active | 2026-04-13 17:13 | 2026-01-06 09:36 | 74 | 0 | 0 | 0 | Ok | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 16:19 | 2026-01-06 09:35 | 48 | 6 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 17:07 | 2026-01-06 09:35 | 47 | 15 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 16:14 | 2026-01-06 09:35 | 46 | 3 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 17:20 | 2026-01-06 09:35 | 52 | 37 | 0 | 0 | Attention | OpenBasecamp |
FujiClean CEN7 with single pump station & Tricel control panel for ps - Chris B., & Andy Lowe | Active | 2026-04-13 17:19 | 2026-01-06 09:34 | 71 | 0 | 0 | 0 | Ok | OpenBasecamp |
FujiClean CEN5 gravity - Shaun Coupe & Callum Thacker | Active | 2026-04-13 17:09 | 2026-01-06 09:34 | 63 | 0 | 0 | 0 | Ok | OpenBasecamp |
Marsh Ensign 6 STP with gravity outlet - Chris B. & Andy Lowe | Active | 2026-04-13 17:00 | 2026-01-06 09:34 | 60 | 0 | 0 | 0 | Ok | OpenBasecamp |
Sandy Sandon - Septic Tank lead - Not Emptying | Active | 2026-04-13 17:32 | 2026-01-06 09:34 | 47 | 31 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 17:28 | 2026-01-06 09:34 | 47 | 14 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 17:23 | 2026-01-06 09:34 | 46 | 3 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 17:20 | 2026-01-06 09:34 | 47 | 23 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 17:12 | 2026-01-06 09:34 | 47 | 3 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 17:07 | 2026-01-06 09:34 | 47 | 35 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 17:06 | 2026-01-06 09:34 | 47 | 26 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 16:58 | 2026-01-06 09:34 | 47 | 5 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 16:51 | 2026-01-06 09:34 | 48 | 24 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 16:41 | 2026-01-06 09:34 | 49 | 35 | 0 | 0 | Attention | OpenBasecamp |
Connection to existing mains sewer - Chris B. & his associate Andy Lowe | Active | 2026-04-13 16:29 | 2026-01-06 09:34 | 61 | 0 | 0 | 0 | Ok | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 16:15 | 2026-01-06 09:34 | 47 | 36 | 0 | 0 | Attention | OpenBasecamp |
FujiClean CEN10 with pump station - Shaun Coupe & his associate Callum Thacker | Active | 2026-04-13 16:01 | 2026-01-06 09:34 | 63 | 0 | 0 | 0 | Ok | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 16:00 | 2026-01-06 09:34 | 51 | 11 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 15:58 | 2026-01-06 09:34 | 47 | 5 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 15:57 | 2026-01-06 09:34 | 48 | 27 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 15:57 | 2026-01-06 09:34 | 47 | 3 | 0 | 0 | Attention | OpenBasecamp |
Alison Rickett CHATSWORTH 2022 lead | Active | 2026-04-13 15:51 | 2026-01-06 09:34 | 47 | 29 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 17:46 | 2026-01-06 09:34 | 41 | 16 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 17:32 | 2026-01-06 09:34 | 45 | 3 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 17:32 | 2026-01-06 09:34 | 44 | 1 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 17:31 | 2026-01-06 09:34 | 48 | 1 | 0 | 0 | Attention | OpenBasecamp |
Ray Walker, Lyne Lodge, Bridge Lane, Virginia Water, GU25 4EE, rs.walker@tiscali.co.uk, 01932 562470 Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 17:26 | 2026-01-06 09:34 | 42 | 1 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 17:22 | 2026-01-06 09:34 | 44 | 1 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 16:46 | 2026-01-06 09:34 | 47 | 1 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 16:46 | 2026-01-06 09:34 | 46 | 5 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 16:35 | 2026-01-06 09:34 | 62 | 4 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 16:34 | 2026-01-06 09:34 | 45 | 3 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 15:59 | 2026-01-06 09:34 | 42 | 2 | 0 | 0 | Attention | OpenBasecamp |
Penny Dyer - The Cowyards, Blenheim Park, Oxford Road, Woodstock OX20 1QR pennydyer@ridge.co.uk 01993 815195 | Active | 2026-04-13 17:19 | 2026-01-06 09:34 | 14 | 0 | 0 | 0 | Ok | OpenBasecamp |
Renew septic tank | Active | 2026-04-13 16:48 | 2026-01-06 09:34 | 48 | 15 | 0 | 0 | Attention | OpenBasecamp |
Renew Drainfield. | Active | 2026-04-13 16:06 | 2026-01-06 09:34 | 44 | 11 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 17:44 | 2026-01-06 09:34 | 45 | 2 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 17:41 | 2026-01-06 09:34 | 47 | 24 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 17:37 | 2026-01-06 09:34 | 41 | 2 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 17:32 | 2026-01-06 09:34 | 41 | 12 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 17:18 | 2026-01-06 09:34 | 42 | 16 | 0 | 0 | Attention | OpenBasecamp |
New Septic Tank to a drainfield | Active | 2026-04-13 16:46 | 2026-01-06 09:34 | 45 | 5 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 16:36 | 2026-01-06 09:34 | 42 | 26 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 15:52 | 2026-01-06 09:34 | 45 | 25 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 15:50 | 2026-01-06 09:34 | 40 | 23 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 17:37 | 2026-01-06 09:34 | 41 | 22 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 17:30 | 2026-01-06 09:34 | 41 | 11 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 17:21 | 2026-01-06 09:34 | 49 | 24 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 17:18 | 2026-01-06 09:34 | 44 | 28 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 17:14 | 2026-01-06 09:34 | 40 | 18 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 17:10 | 2026-01-06 09:34 | 42 | 16 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 17:09 | 2026-01-06 09:34 | 41 | 24 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 17:00 | 2026-01-06 09:34 | 47 | 20 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 16:59 | 2026-01-06 09:34 | 42 | 15 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 16:56 | 2026-01-06 09:34 | 45 | 26 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 16:47 | 2026-01-06 09:34 | 41 | 12 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 16:21 | 2026-01-06 09:34 | 40 | 21 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 16:07 | 2026-01-06 09:34 | 43 | 11 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 15:50 | 2026-01-06 09:34 | 41 | 22 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 15:49 | 2026-01-06 09:34 | 66 | 30 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 17:43 | 2026-01-06 09:34 | 41 | 23 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 17:42 | 2026-01-06 09:34 | 40 | 15 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 17:39 | 2026-01-06 09:34 | 41 | 16 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 17:36 | 2026-01-06 09:34 | 41 | 7 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 17:32 | 2026-01-06 09:34 | 41 | 15 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 17:27 | 2026-01-06 09:34 | 40 | 11 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 16:58 | 2026-01-06 09:34 | 40 | 22 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 16:53 | 2026-01-06 09:34 | 40 | 9 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 16:47 | 2026-01-06 09:34 | 40 | 10 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 16:44 | 2026-01-06 09:34 | 41 | 20 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 16:31 | 2026-01-06 09:34 | 48 | 23 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 16:10 | 2026-01-06 09:34 | 41 | 14 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 16:07 | 2026-01-06 09:34 | 43 | 15 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 15:59 | 2026-01-06 09:34 | 40 | 10 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 15:55 | 2026-01-06 09:34 | 43 | 24 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 15:52 | 2026-01-06 09:34 | 40 | 21 | 0 | 0 | Attention | OpenBasecamp |
STP Install Sales - 2020 [please use current one] | Active | 2026-04-24 12:20 | 2026-01-06 09:34 | 365 | 328 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 17:36 | 2026-01-06 09:34 | 39 | 10 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 17:29 | 2026-01-06 09:34 | 41 | 18 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 17:28 | 2026-01-06 09:34 | 44 | 3 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 17:21 | 2026-01-06 09:34 | 40 | 5 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 17:17 | 2026-01-06 09:34 | 41 | 11 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 17:14 | 2026-01-06 09:34 | 49 | 7 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 17:10 | 2026-01-06 09:34 | 41 | 12 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 17:09 | 2026-01-06 09:34 | 40 | 11 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 17:08 | 2026-01-06 09:34 | 40 | 18 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 17:08 | 2026-01-06 09:34 | 39 | 11 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 16:45 | 2026-01-06 09:34 | 40 | 14 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 16:24 | 2026-01-06 09:34 | 40 | 7 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 15:58 | 2026-01-06 09:34 | 41 | 11 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 15:53 | 2026-01-06 09:34 | 40 | 2 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 15:52 | 2026-01-06 09:34 | 39 | 8 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 17:42 | 2026-01-06 09:34 | 42 | 9 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 17:35 | 2026-01-06 09:34 | 38 | 4 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 17:09 | 2026-01-06 09:34 | 41 | 15 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 17:08 | 2026-01-06 09:34 | 38 | 10 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 17:07 | 2026-01-06 09:34 | 37 | 9 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 16:53 | 2026-01-06 09:34 | 38 | 4 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 16:51 | 2026-01-06 09:34 | 38 | 3 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 16:47 | 2026-01-06 09:34 | 37 | 5 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 16:23 | 2026-01-06 09:34 | 39 | 9 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 16:12 | 2026-01-06 09:34 | 38 | 8 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 15:55 | 2026-01-06 09:34 | 38 | 2 | 0 | 0 | Attention | OpenBasecamp |
Anthony & Trish Hignett, 1 Hall Farm Cottage, Main Street, Netherseal, Swadlincote, DE12 8BZ | Active | 2026-04-13 15:53 | 2026-01-06 09:34 | 15 | 4 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 17:39 | 2026-01-06 09:34 | 39 | 6 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 17:31 | 2026-01-06 09:34 | 39 | 11 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 17:22 | 2026-01-06 09:34 | 41 | 6 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 17:18 | 2026-01-06 09:34 | 32 | 2 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 17:15 | 2026-01-06 09:34 | 37 | 1 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 17:08 | 2026-01-06 09:34 | 17 | 2 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 16:58 | 2026-01-06 09:34 | 42 | 4 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 16:47 | 2026-01-06 09:34 | 35 | 1 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 16:45 | 2026-01-06 09:34 | 36 | 2 | 0 | 0 | Attention | OpenBasecamp |
Chris Humphreys - 07727 022868 - 1 Old Dam Road, Allastone, Lydney, Gloucester, GL15 4EY - ju.chris18@yahoo.co.uk | Active | 2026-04-13 15:59 | 2026-01-06 09:34 | 12 | 0 | 0 | 0 | Ok | OpenBasecamp |
Remedials that require quotation | Active | 2026-04-24 11:20 | 2026-01-06 09:34 | 688 | 366 | 0 | 0 | Attention | OpenBasecamp |
591 Ace Screener, Prefab and Lisep | Active | 2026-04-13 16:14 | 2026-01-06 07:53 | 6 | 6 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 16:05 | 2026-01-05 09:29 | 55 | 5 | 0 | 0 | Attention | OpenBasecamp |
Eileen Canning - Pipework Amends - Lakeside Cottage, Wallingwells, Worksop S81 8DA - Angela Contact (Daughter) 07866 136930 - moonstoneanji@hotmail.co.uk | Active | 2026-04-13 16:16 | 2025-12-23 17:09 | 20 | 0 | 0 | 0 | Ok | OpenBasecamp |
Llangaffo STW - Eric Wright - Welsh Water (Dwr Cymru) | Active | 2026-04-13 16:54 | 2025-12-18 09:03 | 27 | 1 | 0 | 0 | Attention | OpenBasecamp |
Niall Ashford - PERC TEST - J P Alternative Education - Kingswood Centre Ltd, Barn Lane, Albrighton, Staffordshire, Wolverhampton, WV7 3AW -niall.ashford@jpae.uk – 07538 020330 | Active | 2026-04-13 17:12 | 2025-12-18 09:01 | 20 | 0 | 0 | 0 | Ok | OpenBasecamp |
1500 ACE Inlet (ex Amble sp41994?) | Active | 2026-04-24 11:17 | 2025-12-16 13:12 | 9 | 3 | 0 | 0 | Attention | OpenBasecamp |
Service Exchange bandscreens for 1500 ACE Inlet | Active | 2026-04-13 15:54 | 2025-12-15 08:06 | 2 | 2 | 0 | 0 | Attention | OpenBasecamp |
Stonehenge - Nijhuisindustries -Natural Resources England | Active | 2026-04-13 17:37 | 2025-12-08 11:14 | 26 | 0 | 0 | 0 | Ok | OpenBasecamp |
Welford - Hangman’s Stone Lane, Welford, West Berkshire, RG20 7EX - Thames Water | Active | 2026-04-13 17:46 | 2025-12-05 15:41 | 22 | 1 | 0 | 0 | Attention | OpenBasecamp |
Overseal S-48782 | Active | 2026-04-13 17:17 | 2025-12-03 14:03 | 1 | 1 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 16:45 | 2025-12-03 08:23 | 48 | 8 | 0 | 0 | Attention | OpenBasecamp |
HASTOE - SITES, SERVICES AND QUOTES | Active | 2026-04-13 16:31 | 2025-12-02 21:46 | 50 | 33 | 0 | 0 | Attention | OpenBasecamp |
991 ACE Screener Pre-fabricated Package | Active | 2026-04-13 16:33 | 2025-11-18 14:47 | 26 | 26 | 0 | 0 | Attention | OpenBasecamp |
Fisher German - 1-2 Chilvester Hill Cottages, Chilvester Hill, Calne SN11 0LR - Drainfield remedials Fisher German - 1-2 Chilvester Hill Cottages, Chilvester Hill, Calne SN11 0LR - Drainfield remedials | Active | 2026-04-13 16:18 | 2025-11-17 16:00 | 26 | 0 | 0 | 0 | Ok | OpenBasecamp |
ST BREWARD WWTW SERVICE AND SPARES | Active | 2026-04-13 17:35 | 2025-11-17 11:38 | 34 | 31 | 0 | 0 | Attention | OpenBasecamp |
New flow control system to fit existing 491 ACE Screener | Active | 2026-04-13 16:54 | 2025-11-12 13:30 | 25 | 24 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 16:55 | 2025-11-12 11:36 | 65 | 0 | 0 | 0 | Ok | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 16:43 | 2025-11-12 11:35 | 64 | 0 | 0 | 0 | Ok | OpenBasecamp |
Sewer connection - Chris B. | Active | 2026-04-13 15:52 | 2025-11-12 11:34 | 54 | 17 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 17:13 | 2025-10-31 14:03 | 51 | 23 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 16:13 | 2025-10-31 13:14 | 52 | 17 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 16:45 | 2025-10-31 13:13 | 47 | 20 | 0 | 0 | Attention | OpenBasecamp |
ATEX 741 ACE Screener C/W LS305-4 | Active | 2026-04-13 17:46 | 2025-10-21 11:20 | 0 | 0 | 0 | 0 | Ok | OpenBasecamp |
Hannington - Queens Rd, Swindon SN6 7RP (opposite The Jolly Tar pub) - https://what3words.com/meals.buckling.dude - Thames Water | Active | 2026-04-13 16:27 | 2025-10-17 17:22 | 22 | 0 | 0 | 0 | Ok | OpenBasecamp |
Leckhampstead - B4494, West Berkshire - RG20 8QU -https://w3w.co/pays.clashing.alas - Thames Water | Active | 2026-04-13 16:52 | 2025-10-17 17:19 | 22 | 0 | 0 | 0 | Ok | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 16:33 | 2025-10-17 16:02 | 64 | 2 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 17:25 | 2025-10-15 11:29 | 54 | 0 | 0 | 0 | Ok | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 16:08 | 2025-10-09 16:32 | 56 | 3 | 0 | 0 | Attention | OpenBasecamp |
741 ACE Screener in a channel | Active | 2026-04-13 16:50 | 2025-10-07 11:35 | 26 | 26 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 16:57 | 2025-09-30 10:14 | 47 | 4 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 17:33 | 2025-09-30 10:09 | 47 | 4 | 0 | 0 | Attention | OpenBasecamp |
590 ACE screener in pre-fab inlet complete with panel | Active | 2026-04-13 16:36 | 2025-09-30 10:09 | 24 | 23 | 0 | 0 | Attention | OpenBasecamp |
Packaged Treatment Plant / Pump Station project | Active | 2026-04-13 16:43 | 2025-09-30 10:08 | 47 | 20 | 0 | 0 | Attention | OpenBasecamp |