Won Work

Back To Quotes
QuoteAcceptedQuote DateCustomerSiteTotalOwnerStatusActions
10586 2026-04-28 15:45:062026-04-28
Neil Timmins
Pump
1 Brampton Bridge (SY7 0HQ)£51.12sent
10372 2026-04-28 14:14:232026-04-24
The Farmhouse (A1338)
Standard service to your off mains drainage system. Includes one number wastewater engineer onsite for up to one hour, travel & mileage. Any additional parts or labour required will be agreed with you onsite before any additional costs are incurred.
The Farmhouse (S18 7WA)£255.60cancelled
10293 2026-04-28 14:08:492026-04-24
Haven Nook (C1220)
Your routine service for your off-mains drainage system is due in May 2026. This service includes one wastewater engineer attending onsite for up to one hour, along with all travel and mileage costs. If any additional parts or labour are required, these will be discussed and agreed with you onsite before any extra costs are incurred. We will contact you over the coming weeks to arrange a convenient date to ensure your system is serviced on time. If you have preferred dates, please let us know by accepting the quotation and entering your availability. If you have any questions or need further information, please don’t hesitate to contact us on 01773 767612 or via email at enquiries@hec.co.uk. Thank you for your continued custom.
Haven Nook (CW4 8HS)£291.60cancelled
10439 2026-04-28 14:00:302026-04-24
Betel of Britain
Your routine service for your off-mains drainage system is due in May 2026. This service includes one wastewater engineer attending onsite for up to one hour, along with all travel and mileage costs. If any additional parts or labour are required, these will be discussed and agreed with you onsite before any extra costs are incurred. We will contact you over the coming weeks to arrange a convenient date to ensure your system is serviced on time. If you have preferred dates, please let us know by accepting the quotation and entering your availability. If you have any questions or need further information, please don’t hesitate to contact us on 01773 767612 or via email at enquiries@hec.co.uk. Thank you for your continued custom.
Manna Farm (NG14 6NW)£244.80cancelled
10283 2026-04-28 13:59:072026-04-24
Twizzles Barn (B1143)
Twizzles Barn (B79 9HN)£0.00cancelled
10577 2026-04-28 13:45:302026-04-28
Michelle TESTING
Testing 123
michelle (DE4 3FZ)£1188.00sent
10219 2026-04-27 15:53:352026-04-23
Brian Steele (NS)
Following on from our recent site visit, our engineer has advised that a de-sludge is required on your sewage system.
54 Sydney Road (CW1 4HG)£275.00Esther Sisson sent
10515 2026-04-27 11:49:582026-04-27
Ponders Bridge Management Company Limited
Ponders Bridge (PE26 2SQ)£0.00sent
10466 2026-04-24 17:15:412026-04-24
Rest and Wild Ltd
Detailed: Standard service of five number PortaPura sewage treatment plant. Includes one number wastewater engineer onsite for up to five hours, travel & mileage. Any additional parts or labour required will be agreed with you onsite before any additional costs are incurred. Tanker includes up to 2500 gallons across all five units and based on access for tanker within 30m of hardstanding.
£1998.00accepted
10454 2026-04-24 11:11:032026-04-24
Luke Luke Test
£0.00sent
10456 2026-04-24 08:08:092026-04-24
Luke Luke Test
test quote
£148.14cancelled
10234 2026-04-23 22:15:012026-04-24
Luke Luke Test
£51.12sent
10233 2026-04-23 21:36:102026-04-23
Luke Luke Test
Testing testing 123
£864.00sent
10051 2026-04-23 16:42:092026-04-23
Rest and Wild Ltd
Standard service of five number PortaPura sewage treatment plant. Includes one number wastewater engineer onsite for up to five hours, travel & mileage. Any additional parts or labour required will be agreed with you onsite before any additional costs are incurred. Tanker includes up to 2500 gallons across all five units and based on access for tanker within 30m of hardstanding.
£1998.00sent
9276 2026-04-22 10:53:572026-03-02
Valerie Minns (B1326)
Following on from our recent visit, our engineer has advised that a desludge of your system is required. Please note, this price is based on no access restrictions for a 6-wheeler vehicle and the unit is located within 30m of hard standing ground (additional hose can be provided with prior notice). The job will usually be completed within 5 -10 working days and we would require payment prior to our attendance. Quotations are valid for 14 days. Should you wish to proceed or require further information, please do not hesitate to contact us. This includes 1000 gallons which is usually sufficient, however any additional gallonage will be discussed with you before any additional costs are incurred.
£275.00sent
9982 2026-04-22 06:48:352026-04-22
Valerie Minns (B1326)
Standard service to your off mains drainage system. Includes one number wastewater engineer onsite for up to one hour, travel & mileage. Any additional parts or labour required will be agreed with you onsite before any additional costs are incurred.
Badger Barn (BB10 3RA)£255.60Michelle Marriottcancelled
9831 2026-04-14 15:20:372026-04-13
Stephen Plant
Thank you for your recent enquiry for a sewage system compliance/condition check. You have advised that you require a basic survey which includes: - Carrying out an assessment of your current tank and discharge to advise if the system is compliant including x1 hour onsite - Report on compliance of your system - Report on condition of your system - Remedial options and costs if required - Dye test of all accessible downpipes/guttering at ground level Please note that the results may be inconclusive depending on the normal working levels within the tank, access to the outlet and access to the downpipes. If you have had any issues in the past with your unit, we would recommend that you have a desludge of the system at the time of our visit as a minimum. Please speak to us if you are not sure what level of survey is required.
£354.00sent
9796 2026-04-14 15:07:072026-04-09
Wrigleys Hay Barn (A1567)
Following on from our recent site visit, our engineer has advised that a de-sludge is required on your sewage system.
Wrigleys Hay Barn (WA13)£275.00Esther Sisson accepted
9853 2026-04-13 15:25:512026-04-13
English Lakes, Hotels, Resorts & Venues (C1283)
Standard service to your off mains drainage system. Includes one number wastewater engineer onsite for up to one hour, travel & mileage. Any additional parts or labour required will be agreed with you onsite before any additional costs are incurred.
£375.60sent
9778 2026-04-10 14:14:242026-04-08
Diane Barker
Thank you for your recent enquiry for a sewage system compliance/condition check. You have advised that you require a basic survey which includes: - Carrying out an assessment of your current tank and discharge to advise if the system is compliant including x1 hour onsite - Report on compliance of your system - Report on condition of your system - Remedial options and costs if required - Dye test of all accessible downpipes/guttering at ground level Please note that the results may be inconclusive depending on the normal working levels within the tank, access to the outlet and access to the downpipes. If you have had any issues in the past with your unit, we would recommend that you have a desludge of the system at the time of our visit as a minimum. Site: 11 Moss Colliery Road, Swinton, M27 6LH TANK IN FRONT GARDEN OF NUMBER ONE
£354.00accepted
9776 2026-04-08 11:46:222026-04-08
Ms Mitchell - The Poplars (A1230)
Thank you for your recent enquiry for a desludge of your off mains drainage system. Please note, this price is based on no access restrictions for a 6-wheeler vehicle and the unit is located within 30m of hard standing ground (additional hose can be provided with prior notice). This includes 1000 gallons which is usually sufficient, however any additional gallonage will be discussed with you before any additional costs are incurred. Booked for 16th April 2026 as discussed.
£275.00accepted
9660 2026-04-01 13:58:212026-03-30
Mark Pereira
Callout to your pre 2006 BA / BB Biodisc , you have advised the system is not turning and you would like a quote to replace both bearings and convert the system to be driven by chain and sprockets Quote includes 2 hours onsite Any additional parts or labour required will be agreed with you onsite before any additional costs are incurred.
£1008.90accepted
9674 2026-03-30 16:46:062026-03-30
Glyn Miles
Parts fitted at service
£292.80accepted
9665 2026-03-30 14:53:012026-03-30
Hazelhurst
Thank you for your recent enquiry for a sewage system compliance/condition check. You have advised that you require a basic survey which includes: - Carrying out an assessment of your current tank and discharge to advise if the system is compliant including x1 hour onsite - Report on compliance of your system - Report on condition of your system - Remedial options and costs if required - Dye test of all accessible downpipes/guttering at ground level Please note that the results may be inconclusive depending on the normal working levels within the tank, access to the outlet and access to the downpipes. If you have had any issues in the past with your unit, we would recommend that you have a desludge of the system at the time of our visit as a minimum. As discussed, we will also complete a service of the Klargester BA BioDisc with pumped outlet and advise if this requires a desludge.
Hazelhurst (DE56 2EA)£354.00accepted
9642 2026-03-27 14:53:102026-03-27
Chris Deaton
Further to our recent telephone conversation, please find below the quotation for an engineer to attend site as a passing visit to assess the pump station for remedial quotation.
£114.00accepted